Project

Usine de filtration d’Arvida

City of Arvida
Year

2021

Client

Inter-Project

Project description

Totaling an investment of close to $20M, the electrical work on this large-scale project consists of providing the equipment, materials, connections, tools, testing, commissioning, coordination with other disciplines and all other services and materials required for the dismantling of the building services and process equipment as well as the :

  • Grounding;
  • Wires and cables ;
  • Conduits ;
  • Fused and non-fused switches;
  • Wiring devices;
  • Lighting ;
  • Door contacts ;
  • Fire alarm equipment ;
  • Connections of equipment from other disciplines;
  • Electrical distribution equipment.